Tuesday, June 8, 2010

City of Laredo Golf Course



The City of Laredo recently selected 5 design/build teams to interview for their planned municipal golf course. Here is the article. Unfortunately we were not selected as one of the finalists.

What was notable about this request for qualifications?
31 teams in total submitted
Each team included a golf course architect and builder - it is a turnkey project including infrastructure and clubhouse.
The initial meeting was standing room only - there were more architects and builders than at the Golf Industry Show.

Above is the aerial of the site on the Rio Grande. The property was donated to the city by a local developer. The water rights are essentially free. The city has $6.6 Million to spend on the project - and that was including the bottled water we were given during the site visit - they had no room for over-spending.

It is a very cool site with lots of features - big arroyos, arid vegetation and good materials to build a course.

When the city announced that the $6.6MM included the clubhouse and infrastructure, there was an audible groan from the attendees. Most, if not all, thought it was way too low.

Our team thought it was more than enough. If I write more about the proposal I'll describe how our team was formed -- I think we were the best team for the city.
I wasn't originally going to submit, because of the difficulty in winning a municipal project -- the team was too good to not submit.

Wednesday, December 24, 2008

Infierno Got Drainage


This fall the bunkers were completed. Infierno was the last one - Don saved the best for last. It is big - 11,750 square feet the last time I measured. It is about 20% of the bunker square footage on the course.  We have a total of 56,000 sft spread across 61 bunkers, and the average size if far less than those numbers would indicate.  

The bunker on #7 is also large, leaving an average size of 600 sft for the remainder of the bunkers.  Don and I both prefer a smaller bunker.  We have one that is 150 sft that is all the penalty one would need around the 2nd green.

The picture above is of the crew installing drainage pipe throughout the bunker.  The pipe is designed to collect the water and get it away from the sand.  Bunker drainage is a big issue today, in that there are many different ways to manage the water and maintenance, with nothing that works ideally or practically.

The best way to keep water out of bunkers is by shaping the land to divert the water, and that keeps the balls out too.  That method would make an ugly bunker that didnt' come into play.  We have none of those!

Holiday Cheer

Saturday, December 6, 2008

Deflation at the golf course



Deflation has spread to Texas. The above chart is the evolution of the golf course construction budget for Wolf Point Club - from initial budget to actual $'s - no numbers attached for now - the decrease is 40%. I hope someday building a course practically can be appreciated.

*Golf Course Construction is generally quoted to include just the golf course:
Irrigation
Earthwork
Shaping
Drainage
Erosion control
Grassing & grow-in
Feature construction - greens, bunkers, tees
Lakes & water features
Clearing

The following is not included:
Clubhouse
Access roads & infrastructure
Maintenance facility and equipment
Utilities - water & electric
Engineering & design fees

When I worked for Lockheed I always beat my weight and schedule budgets.... more important as they had a bigger effect on costs than actual costs.
When Don ran his own golf course - he did too.

Sunday, March 16, 2008

I can't wait to play...

Don has started our final major task - detail bunker work. But more importantly - last week after he was decribing chipping to the difficult 14th green - Don said "I can't wait to play!"

Sunday, March 9, 2008

What is CAD good for?

CAD (Computer Aided Design) is great for aerospace, automotive, architecture - almost all manufacturing. In my opinion CAD is not ideal for golf design.

The above image is a CAD model of part of this satellite -- the part was called the "doghouse". Left is a transmit feed array - it transmits signals directly to the hand held mobile user on the earth ~23,000 miles away. Middle is a separate antenna that communicates with ground stations so a caller can speak with someone on the other side of the earth. To the right is the receive feed array that picks up the tiny signal from the mobile user.

How is CAD best utilized?


1. The above model was a moving dynamic assembly that had the mass, structural and thermal properties of all the components and the total assembly. Everything was modeled exactly as it was to be construted - it was a perfect (within thousandths of an inch any way) virtual replica of what we built.


2. Concurrent engineering. In projects involving large teams everyone can work with the same model and have ownership to their components. So if the propulsion, power or spacecraft structural groups made a change I'd see it live in my model just as they could see any part of the antenna in theirs.

3. Technical details and massive ability to repeat - those red string looking items are co-axial cables, and they are actually flexible in the computer model as in real life. There are little blue connectors at the ends and those are all instances of the same connector model - so if one changes they all changes.

Tommorrow I'm going to give an example of how CAD helped at Lockheed and the following day I will describe why I don't use CAD any longer.






Wednesday, March 5, 2008

Working in the field

Sometimes I get asked why I work in the field. The above picture is a continuation of my previous work experience threads -- if you click aerospace either here or to the right under labels it will bring up the previous posts with that label.

A few items of note in the above image - I'm in Montreal integrating part of our structure (things with the holes) to a sub-contract item (yellow metal thing) which when combined got delived back to our plant for more integration and test. The item is a Receive Feed Array which is part of the antenna for the ACeS spacecraft. Incidently this piece that I am hanging over cost more than most golf courses - even in 1998 dollars. I'm wearing a hat, smock and gloves because the feed isn't supposed to get dirty. I went up with a team of three technicians - Steve, Frank and Chuck - for about a week. I mentioned Montreal because it is a very fine place to be for a week.

The traditional role of the engineer is to design and plan the system and write specs galore detailing the integration and test portions - this antenna needs to be placed in a rocket ship, survive launch into outer space then deploy and function. During the integration - or build - there are so many steps to check off and document that is usually a full time job in itself.

My first engineering job after college was with a large medical device company in one of their research and development departments. I used to hang out in the machine shops watching the parts and tools get built. Why? - because it made me a better designer - seeing how a ball end mill machines a radius stays in your mind as you design - it is so much more tangible.

So why am I lying on a gurney attached to a fork lift? One, no one else knew how to build this antenna without my instructions - at this point even I wasn't too sure how as it was a first of its kind. Two, it was a great learning experience for me and the crew. Three, it was a lot of fun - not just the Montreal part with Steve, Frank and Chuck.

What does this have to do with golf course deisgn? Everything. Some people may consider my efforts working on the construction at Wolf Point were for me to have some glossy images for my brochure and to say how I built the course. Some architects do practice this with great effect - especially pointing with rolled up drawings under thier ams. For me it was the same three above reasons -- I am the one with the most design details in my head and I don't think it is fruitful to draw every detail -- I learn how my instructions and intent get put in the dirt -- and it was fun. I didn't build Wolf Point - Don with his crew did - I did help a lot, sometimes crucially, and the reasons for my help are invaluable to me, Wolf Point and my future projects.

I added this picture so it doesn't look like I did all the work. Cheers.

Tuesday, February 5, 2008

Some examples of iterations - 14th Fairway



Last week I showed an image of several iterations of the course. I'm going to further explain how the process of acquiring field data and design evolution worked together. The above flash images show part of the evolution of the 14th fairway.

The first of 3 images show green highlighting - which is the planned clearing. Originally I was trying to find the best angle into the green that crossed the creek. There were two very nice live oaks that surrounded the eventual creek opening. I had to select which tree to have removed.

During the clearing Don and I found that there was an even nicer tree near the 2nd landing area - it is a par 5. So now the question was which side of the tree to go around. Between our time on site and updating the GPS and construction files it was easy to see the impacts of our decision. We decided to leave the tree - figuring we could always take it down if the hole wasn't better strategically.

The third and final image shows how we incorporated the tree into the irrigation plans. The tree location was brought back into the construction documents and the irrigation plan was modified. Note we also didn't build a few bunkers as the strategy of the tree and the shaping of the fairway created enough strategy to make 14 a very fine hole.

Monday, January 21, 2008

Iterations every visit

How effective can the design evolution and construction process be chronicled and how iterative should they be as processes?

Typically when a course is built to print, or by what the plans say, the builder follows the plans and the architect visits to make sure everything is going according to that plan. If there are any problems they adapt and find a solution. If something isn't turning out quite right, they modify the construction. There are many projects that have been built and will be built where the design is modified significantly in the field - after it has been finished and even irrigated at considerable wasted expense!

Throughout the design and construction of Wolf Point I would bring the GPS unit on site integrated with the latest plan - so when I walked around I could see where I was relative to the as yet unbuilt golf course. We used the tool to assist us with layout, clearing, earthwork, shaping, drainage, irrigation, feature construction and grassing. At each stage and with each visit I would map any new features (a nice live oak we saved) or changes we made in the field into the GPS unit and incorporate those into the construction documents. I'd study them in the office and often make additional adjustments to subsequent stages - like irrigation. I would then incorporate those adjustments into the GPS unit for the next site visit. So each and every visit would entail an iteration of incorporating planned changes and then recording any field changes -- over and over again until we were finished.

The image above is about half of the image layouts that were used during construction of various stages. It is one way I have a record of the process through the many snapshots of the GPS images.

Here was the Turfnet Article that described the process from a broader perspective.

Wednesday, January 16, 2008

What does a slug have to do with golf course construction?

How did I communicate complex ideas with our crew? I could draw a very, very detailed plans - which would have been impossible to replicate in the field. I could have flown everyone over to St. Andrews to check out the greens and fairways of The Old Course - because there is nothing like that within 500 miles of Houston.

One of my earlier attempts: one day I said out loud, create some irregular shapes in the 10th fairway, like a bunch of mating slugs. I think they did understand, but the jarring image sure created further discussions about my choice of words rather than the task at hand.

The best way to communicate with the crew is in a clear and practical manner that is easily understood by the crew. I can imagine how many "artists" would struggle to get the vision in their head out of someone else's paint brush. Setting up guidelines and some general rules and giving freedom to the talented ones to create was what worked best for us. Don was instrumental in this capacity - and often as my interpreter. At Wolf Point the guidelines were to make sure everything was practically maintainable -- the slug part was in response to having land-forms be longer - as opposed to the moundy blunt types more typical on golf courses across the US.

I will never forget the feeling of seeing one of our first fairways finished - the 4th - and having such a sense of accomplishment and joy that we had come so far and we had created exactly what we wanted in terms of our overall shaping.

We did have a lot of fun thinking about mating slugs on site - it was a good thing I didn't tell everyone that slugs are hermaphrodites.

Sunday, January 13, 2008

What can happen to your bunkers?

Over time bunkers clog up. There are many new products and methods that were designed to help. It seems as if everyone does their best, and mostly that means accepting the eventual clogging.

One additional maintenance expence is returning the washed sand after a significant rain event. Sometimes it only takes a little rain to wash out a bunker depending on how it was shaped and what area drains into the bunker.

The above pictures are not from Wolf Point. We have made significant efforts to manage the design, construction and maintenance of our bunkers so they will last a long time with modest upkeep. We have finalized our process and will begin the final steps at the course this month. I hope to chronicle a little of what we will do. Don has done considerable research.


Wednesday, January 2, 2008

Final Touches

2008 is the year Wolf Point Club will officially open. I've been really looking forward to the day. The last detail for the course will be the finishing of the bunkers. I post this picture, of the 3rd hole, as a last experiment in what the bunkers may look like.

It came out a little fancy, but it will be hard to predict where the bermuda will "crawl". I followed the existing runners and natural grass lines while makeing this sketch. The other item that sticks out is how the bunkers completely take over the picture. The green is equally important to the strategy of the hole, but very hard to tell. The 2nd bunker is also far more menacing, and hard to tell by the picture also - see the aerial view.


I'm going to do my best this year to photograph the greens - they are way more beautiful than the bunkers.

Thursday, November 15, 2007

The 13th

This is one of the bigger bunkers on the course -- although there is one bigger just a few yards away. The one pictured is nestled next to the 13th green -- the sand to the right of the bunker. It is the longest par 4 on the course -- pretty close to 500 yards depending on your tee -- it is also downwind. If the ball carries the bunker it may bound down to the green, or maybe a little long. You could always play to the right side of the fairway and not have to contend with the bunker -- depending on pin location.

You can see the two biggest bunkers on the course in the new banner image on top of this page. The one to the right is much nastier.

Earlier Holes Featured: 1 - 2 - 3 - 4 - 5 - 7 - 8 - 9 - 10 -11 - 12 - 14 - 15 .

Tuesday, November 13, 2007

Turfnet: The Newsletter


Recently Don and I were interviewed for an article in Turfnet: The Newsletter. The story was based on our use of GPS at our project. Please click if you'd like to read.

Sunday, November 11, 2007

A new bunker....

It has been many months since we've added, or removed, a bunker at the course. This week we are going to do one of each. I should say we may be replacing a tiny one with a bigger one. The above image is a sketch of what the proposed bunker will look like -- it is the one in the middle background. It looks good in the picture, and we'll see how it looks on the ground. Don wasn't looking for any new projects, but this one seems worth the small expense. This is the last area we are grassing -- it should be covered in sprigs and sod in a week or two.

Wednesday, November 7, 2007

Sod


The cold season is upon us. It was a chilly 70 degrees today in Houston – a few warmer at the golf course. Don was determined to not use any sod at all for the grassing -- if we didn't have the rainiest year ever I'm sure he would have succeeded.

Sod is more costly as compared with spriging -- many modern courses sod the entire golf course at an expense between 1/2 & 1 Million US dollars (sprigging is a small fraction of that expense). When sprigging we also control the plant’s growing medium, either sand or sandy loam and all the nutrients – sod farms usually grow their grass in Texas gumbo soils – although our sod farm is top notch. The sprigs also get trained from an early age towards our final maintenance practices -- deep infrequent watering. (Golf turf bermuda grasses are either sprigged or sodded -- there are no seeds)

Well with only a bunch of grassing days left it was decided we'd need some sod to finish. It looks very much like it will be completely grassed by early next week -- "grassed out" is the industry term. I'm still rooting for an Indian Summer to keep everything growing.

In the picture above the crew is sodding around a drain basin. Water collects at the basin while watering -- it is too wet during the heavier demands of growing in the sprigs. The sod gives the area a great big head start. The black plastic pipe is the basin before trimming. The pipe is perforated to allow water in and keep soil infiltration to a minimum -- this one flows back into our irrigation lake. After sodding we trim it and install a small green color drain grate.

Congratulations everyone. I’ll be bringing a lot more beers on my next couple visits.

Thursday, November 1, 2007

The weather is just fine for grassing

It was in the mid 80’s today. It looks like we are getting a good planting season this fall. It is a race now to the first frost. We are very, very close. In the picture above we are prepping the 10th hole, I’m shooting from over the 9th green side bunker -- which is also prepped.

It is incredible what Don is accomplishing with a crew 1/3 the typical size.

It is going to be verdant this spring -- I'm hoping for a hot winter.

Sunday, September 23, 2007

15th Looks Easy Plays Hard

We put the finishing touches on the 15th green earlier this month. It has always been my favorite green – I think it is incredibly unique – and the shaping was original to the site. The directive for the course was to make it challenging and not ball hungry – our client didn’t want the player to be looking for their golf balls.
For me, besides short and wide, it also translates to a course that looks easy, but plays hard. The first picture is the 15th green from a forward tee – it is a par 3. It looks easy to me.



This picture is a closer look at the green. A sand pro is “finishing” or polishing the green. It is directly on the extents of the putting surface – the edge of where we will be mowing the green. The margin for error is slight. The green looks even better from other angles with better shading, but I'll be saving those for when this green is green.


Earlier Holes Featured: 1 - 2 - 3 - 4 - 5 - 7 - 9 - 10 - 11.


Thursday, September 20, 2007

10th fairway

I had hoped to post earlier this week, but it is tough to write more than I already have been – I’ve been updating my brochure, among a few other items – yes I still have a printed brochure in this day and age – I’ve kept it a little smaller to be environmentally friendlier.

So tonight I want to share a picture of the 10th fairway – ripples and all. The further one plays away from the lake the bigger the bumps get near the green – leaving a very tough approach even though it may be only a pitch, it will be tough to get close to the pin.

The stakes are irrigation heads and a few basins. The fairway is 4 rows wide in spots, and only 7 rows long.

Tuesday, September 4, 2007

Spreading Lime with the Dakota

Wayne, our new mechanic – who will be featured as soon as I get a better picture of him, is spreading lime just prior to grassing using our Dakota 440 Turf Tender. Don has lots of preferences for maintenance equipment – he spent a good amount of time with me at last year’s Golf Industry Show sharing some of his insights and experiences. The vendors are a big part of any project - it has been very helpful to see first hand how good service is invaluable.

Wednesday, August 15, 2007

Spillway Pat

Pat, who it inspecting from the top, was responsible for our bridges and the spillway – shown above. The pipe is so for draining the lake - there is a valve a few hundred feet away. The spillway is built to handle quite a bit of overflow rain. It will be working overtime tonight. The cement truck poured the cement into the excavator bucket which was then spread across the framing and rebar structure. See there are lots of uses for an excavator. I have a nice photo of the finished flagstoned surface.
Like many of our visitors - Pat liked to fish. We could count on him to be on site often – and then be off looking for a catch. The locals know of most of the hot spots, and do share a few from time to time.