The crew is the Irrigation Crew, and yesterday's picture was the hole dug for the wet well. The hole is this large for safety reasons, the steps keep the walls from collapsing. It is this deep because it connects the bottom of the lake with the pump station. The opening in the concrete base attaches to the pipe in the lower portion of the picture which runs to the lake. I'll share a sketch and more details tomorrow.
Please fill out the survey, it will be open for two weeks.
No comments:
Post a Comment